top of page
Installations

Elekron E Oy (110kV), Finland Joutseno

Termination

 

ABB HIGH VOLTAGE CABLES (220kV), Lithua / Sweden Nord balt project

Jointing

 

ABB HIGH VOLTAGE CABLES (220kV), Sweden Nord balt project

Jointing

 

ABB HIGH VOLTAGE CABLES (220kV), Sweden Stockholm Ellevio WP2 project

Jointing

 

ABB HIGH VOLTAGE CABLES (220kV), Germany Dolwin 2

Jointing

 

ABB HIGH VOLTAGE CABLES (220kV), Sweden Stockholm tunnel project

Jointing

ABB HIGH VOLTAGE CABLES (220kV), Sweden Stockholm project

Jointing

 

Outotec Oy (132kV), Saudi-Arabia, Jazan Economival City Ptoject

Jointing

 

ABB HIGH VOLTAGE CABLES (220kV), Sweden, Nord Balt project

Jointing

 

RIG Oy (110kV), Finland Tornio

Jointing

 

ABB HIGH VOLTAGE CABLES (220kV), Norway Hagesund, Dolwin beta project

Jointing

 

ABB HIGH VOLTAGE CABLES (220kV), Sweden, Ålink project

Jointing

 

ABB HIGH VOLTAGE CABLES (220kV), Germany, Butendiek

Jointing

PRYAMIAN CABLES (220kV), Latvia Riga, Krievu Saka project

Termination

 

ABB HIGH VOLTAGE CABLES (220kV), Norge, Hammerfest

Termination

 

PRYAMIAN CABLES (220kV), Latvia, Plavinu Hess Project

Termination

 

ABB HIGH VOLTAGE CABLES (220kV), Norge, Bergen Statoil project

Jointing

 

Outotec Oy (132kV), Saudi-Arabia, Jazan Economival City Ptoject

Termination

 

ABB HIGH VOLTAGE CABLES (220kV), Sweden Karlskrona – TH

Training

 

ABB HIGH VOLTAGE CABLES (220kV), Sweden, Sydvästlängen project

Jointing

 

ABB HIGH VOLTAGE CABLES (220kV), Norway, Bergen Troll A project

Jointing

 

ABB HIGH VOLTAGE CABLES (220kV), Lithua, Nord Balt project

Termination

 

ABB HIGH VOLTAGE CABLES (220kV), Germany, Dolwin 2 Project

Jointing

 

ABB HIGH VOLTAGE CABLES (245kV), USA New York, Hess project

Jointing and termination​

ELTEL NETWORKS OY [145 kV], Hamina, Finland

Installation of Pfisterer Connext 6-s GIS terminations
Installation of Prysmian Click-Fit OTC-123 outdoor terminations
Installation of XVRS91800 cable joints

PRYSMIAN FINLAND OY [245 kV], St. Petersburg, Russia
Repairing of terminations

ABB HIGH VOLTAGE CABLES [245 kV], Leer, Germany

Installation of cable joints

PRYSMIAN CABLES AND SYSTEMS OY [420 kV], Plavinu, Latvia
Installation of CFJ-420, OTC-420, CEMTO-420 cable joints and terminations

PRYSMIAN CABLES AND SYSTEMS OY [420 kV], St. Petersburg, Russia
Installation supervision of CFS-420-OF cable joints

PRYSMIAN CABLES AND SYSTEMS OY [420 kV], Plavinu, Latvia
Installation of CFJ-420, OTC-420, CEMTO-420 cable joints and terminations

PRYSMIAN CABLES AND SYSTEMS OY [420 kV], St. Petersburg, Russia
Installation supervision of CFS-420-OF cable joints

PRYSMIAN CABLES AND SYSTEMS OY [123 kV], Riga, Latvia
Installation supervision of OTC-123-X terminations
Installation supervision of CFJ-123 cable joints

ELTEL NETWORKS OY [110 kV], Riihimäki, Finland
Installation of XVRS91 cable joints
Installation of OTC-123 terminations

PRYSMIAN CABLES AND SYSTEMS OY [110 kV], Vilna, Lithuania
Installation of OTS-123-X terminations
Installation of CFJ-123 cable joints

ABB HIGH VOLTAGE CABLES [245 kV], San Diego, USA
Installation of cable joints and terminations

WÄRTSILÄ FINLAND OY [110 kV], St. Lucia
Delivery of terminations

ABB HIGH VOLTAGE CABLES [245 kV], Leer, Germany
Installation of cable joints

ABB HIGH VOLTAGE CABLES [245 kV], Svindrect, Netherlands
Installation of cable joints

ABB HIGH VOLTAGE CABLES [245 kV], Guernsey, UK
Installation of offshore cable joints

ABB HIGH VOLTAGE CABLES [245 kV], Nables, Italy
Repairing of cable joints

Repairing of terminations

ABB HIGH VOLTAGE CABLES [245 kV], Dolwin, Germany
Installation of cable joints
Installation of terminations

ABB HIGH VOLTAGE CABLES [245 kV], Ooestaube, Belgium
Installation of cable joints
Installation of terminations

ABB HIGH VOLTAGE CABLES [245 kV], Stockholm, Sweden
Installation of terminations

ABB HIGH VOLTAGE CABLES [245 kV], San Diego, USA
Installation of cable joints
Installation of terminations

ABB HIGH VOLTAGE CABLES [245 kV], Wales, UK

Installation of offshore cable joints

ABB HIGH VOLTAGE CABLES [245 kV], Ireland
Installation of cable joints
Installation of terminations

​​​
PRYSMIAN CABLES AND SYSTEMS LTD [110 kV], Calgary, Canada
Installation supervision of cable joints
Installation supervision of terminations

EMPOWER OY [110 kV] Petkula, Finland
Installation of terminations

FORTUM [245 kV] Stockholm, Sweden
Installation of cable joints (Prysmian)
Installation of terminations (Prysmian)

PRYSMIAN CABLES AND SYSTEMS [145 kV], Energo, Latvia
Installation supervision of terminations

STX FINLAND OY [6.6 kV], Rauma, Finland
Testing of high voltage cables (cargo vessel)

TURKU ENERGIA [110 kV], Turku, Finland
Installation of terminations (Pfisterer)

ABB [245 kV] Stockholm, Sweden
Installation of cable joints (ABB)
Installation of terminations (ABB)
​​
ABB [245 kV] Stockholm, Sweden
Installation of cable joints (ABB)
Installation of terminations (ABB)

​PETROKOM [110 kV] St. Petersburg, Russia
Installation supervision and training of cable joints
Installation supervision and training of terminations

PRYSMIAN [154 kV] Calgary, Canada
Installation supervision of cable joints
​Installation supervision of terminations

PRYSMIAN [110 kV] Mikkeli, Finland
Installation of cable joints

PRYSMIAN [245 kV and 345 kV] St. Petersburg, Russia
Installation supervision of cable joints
​Installation supervision of terminations

PRYSMIAN [110 kV] Olkiluoto Nuclear Power Plant, Finland
Installation of terminations

EMPOWER [110 kV] Espoo, Finland
Installation of terminations

PRYSMIAN CABLES AND SYSTEMS [110 kV] Sochi, Russia
Installation of cable joints
​Installation of terminations

SAMSUNG [154 kV] Asan, South Korea
Installation of cable joints

UPM KYMMENE [110 kV], Jämsänkoski, Finland
Installation of terminations (Prysmian)


VAASA ENGINEERING [110 kV], Morocco
Installation of terminations

WESTINGHOUSE ELECTRIC, Ringhals Nuclear Power Plant, Sweden
Installation supervision

EMPOWER [110 kV] Harjavalta, Finland
Installation of cable joints
​Installation of terminations

FORTUM [110 kV] Espoo, Finland
Installation of terminations (Prysmian)

PRYSMIAN CABLES [110 kV] St. Petersburg, Russia
Installation supervision of cable joints
​Installation supervision of terminations

PRYSMIAN [110 kV] Olkiluoto Nuclear Power Plant, Finland
Installation of terminations

PRYSMIAN CABLES [220 kV] St. Petersburg, Russia
Installation supervision of cable joints
​Installation supervision of terminations


CES LENEGRO [110 kV] St. Petersburg, Russia
Installation supervision of cable joints
​Installation supervision of terminations

DC CHEMICALS [175 kV] Gunsan, South Korea
Installation of cable joints
​Installation of terminations

WÄRTSILÄ [110 kV] Tan-Tan, Morocco
Installation of terminations

SAMSUNG [175 kV] Asan, South Korea
Installation of cable joints
​Installation of terminations

PRYSMIAN [175 kV] Kwang Yang, South Korea
Installation of cable joints

REKA CABLE [110 kV] Gdansk, Poland
Installation of terminations

YSAK INDUSTRIES [175 kV] Inchoan City, South Korea
Installation of cable joints
​Installation of terminations

PRYSMIAN [500 kV/DC] New York, USA
Installation supervision of cable joints
​Installation cabling work

​​​
PRYSMIAN [500 kV/DC] New York, USA
Installation supervision of cable joints
​Installation supervision of terminations

EMPOWER [110 kV] Jämsänkoski, Finland
Installation of terminations

EMPOWER [110 kV] Turku, Finland
Installation of terminations

WÄRTSILÄ [110 kV] Tansania

Installation of terminations

Project Management

TVO Teollisuuden Voima Oy

Project management

Finland, Senior Project Engineer on OL3 Nuclear Power Plant Project  

ABB Oy Power Generation Systems Finland

Project Management

Implementation of Switchgear Modernization Project “Simo” including design, manufacturing, dismantling of existing – and installation and testing of new Switchgears and Transformers on TVO 1 and 2nuclear power plant in Olkiluoto Finland.

AREVA NP I&C and Building

Technology Superintended

Electrical Equipment installation as MV- Switchgears, LV- Switchgears, Control cabinets, Main Control Room cabinets and control boards, Instruments Installation and Building Technology installation as lighting, fire alarm, access control, public address and all other telecommunication installation on OL3 nuclear power plant building in Olkiluoto Finland.

Westinghouse Electric Sweden Ab Site

Project Management

Site Planning and Coordination, Site Design, Work Preparation, Installation and Commissioning of I&C Renewal Project on Ringhals 2 covering complete renewal of Main Control Room (MCR) including total 250 I&C cabinets, replacing of Cat A cables and transmitters etc.

ABB Utilities Ab in Malta

Production Management

Mater Dei Hospital Project, Malta

Implementation, Testing and Commissioning of Electrical-, Data-, Tele-communication-, Fire Alarm and all other information and control systems in whole hospital building (totally more than 25 different systems). Hospital covers 6800 different rooms. Installation supervision is performed by Swedish and Finnish supervisors. Local sub-contractor will do Electrical and Tele – technical installation works with staff from Serbia, Moldavia, Russian and locals from Malta.

Westinghouse Atom Ab in Sweden

Supporting Sales Department with Tendering works.

Calculating implementation costs for tenders for Nuclear Power Plant Modifications (example modification on Loviisa Nuclear Power Plants in Finland)

Westinghouse Atom Ab in Sweden

Site Management

Sweden Oskarshamn, Modernization of Oskarshamn I Nuclear Power Plant (Project-MOD).

Implementation of Dismantling-, Installation-, Testing and Commissioning works of ABB Atom/Westinghouse Atom part of the contract. The main contractors were:

- ABB Atom/Westinghouse Atom – Emergency power supply, safety I & C and upgrade of power supply systems, control room and simulator.

- Siemens KWU, Safety concept, process and mechanical systems and new building (EKB)

- Ahlstom Power, HP Turbine, LP Turbine, Middle Turbine casing, HP Feed Heater, HP Cooler and Turbine safety System. 

- NCC, Structural changes of existing buildings.

Under Westinghouse scope was 150 new I&C cubicles, 140 new switchgears cubicles, 10,4 km seismic cable trays, 344 km of cables, 14000 cable end connections, 720 field transmitters installed and 500 existing cubicles modified, 6000 field objects and transmitters tested and simulator upgraded. For the site staff was included 10 management and administration persons, 20 design engineers, 15 engineers for changes and as build, 5 technicians for work preparation, 120 electricians from Germany, Sweden and Finland for dismantling and installation works and 30 testing and commissioning engineers.

ABB Atom Ab/Westinghouse Atom in Sweden

Assistant Site Manager

Sweden Oskarshamn, Modernization of Oskarshamn I Nuclear Power Plant (Project-MOD).

Preparation of time schedule for electrical installation and testing, co-ordination of time schedules with all other contractors and with customer OKG. Preparation of Implementation of Dismantling-, Installation-, Testing and Commissioning works of ABB Atom/Westinghouse Atom part of the contract.

Pirelli Cables and Systems Oy Regional General Management Saudi Arabia, Bahrain, Sharjah, Responsible for Pirelli Cables and Systems product sales to above mentioned countries and implementation of the 69-380kV Transmission and Distribution projects.

NK (NOKIA) CABLES based in Saudi Arabia

Regional General Management

Saudi Arabia, Bahrain, Sharjah,

NK Cable's product sales to above mentioned countries and implementation of the 69-380kV Transmission and Distribution cable projects.

ABB Contracting Co Saudi Arabia
Department Management / Field Operation Transmission and Distribution 132kV-13,8kV substations and transmission lines in Saudi Arabia.

- Execution of all installation, testing and commissioning works.

- Bid calculations of installation and testing and commissioning.

- Preparation and signing of sub-contracts.

- Arranging of all necessary site personnel for civil, installation and testing and commissioning works.
- Preparation of time schedules, reports and follow-up of the progress. The projects implementations took place together with one civil coordinator from Finland, 5 civil supervisor from India, one installation coordinator from Sweden 6-8 installation supervisor from Sweden, Finland, Egypt, India and Philippine, one commissioning Manager from Brazilian, 6-14 testing and commissioning engineers from Sweden, Finland, India, Philippine, Bangle and Egypt.

ABB Electrical Industries Ltd. Saudi Arabia
Project Management (end of the project).

Department Management / Field Operation Distribution

- 132kV-13,8kV 5 s/s Project in Riyadh Saudi Arabia. Department Management works. - Execution of all installation, testing and commissioning works.
- Bid calculations of installation and testing and commissioning.
- Preparation and signing of sub-contracts.

- Arranging of all necessary site personnel for civil, installation and testing and commissioning works.

- Preparation of time schedules, reports and follow-up of the progress.

ABB Electrical Industries Ltd. Saudi Arabia
Project coordination / Supervision

132kV - 13,8kV 5 s/s Project in Riyadh Saudi Arabia.

- Supervision of installation of relay-, control and LV-panels, MV- switchgears and other equipment.

- Cable installation and termination.

- Co-ordination of testing and commissioning works.

The projects implementation of five132/33/13.8kV s/s took place together with one commissioning engineer from Sweden, 6-8 testing and commissioning engineers from India and Philippine, 6 installation engineers and 120 electrician and technicians from local contractor.
The local contractor was the main contractor. ABB had technical responsibility of system design, deliveries of above mentioned equipment’s and carry out total testing and commissioning works at each sub-station.

ABB POWER SYSTEM in India

Installation Management (from the middle of the project)

Rihand Delhi 400kV / 1500MW / 1700A HVDC Transmission Project in India.

- Execution of all installation works and some part of civil works at Rihand Site.

- Preparation of the time schedules for the work to be done by the expatriate supervisory and technical staff.

- Supervision of the expatriate technicians and local contractors.
- Coordination and follow up of the time schedules.

- Managing local contractor’s time schedules.

- Negotiations and engagement of local contractors.

- Follow up and reporting the local costs to the project office.

- Tabulate and report the man-hours to the project office.

- Administration of the accommodations and transportation. The implementation of the project took place together with 6-10 supervisor , 25 electricians (during 4-5month), 6-10 Thyristor Valve Specialists from Sweden,8 foremen, 200 electricians, linemen, fitters, riggers and welders from local contractors.

NOKIA CABLES in Iraq

Project Management 132kV Cable Project in Basrah Iraq

- Execution of all site works, including civil, installation, testing and commissioning.

- Handing over to client Ministry of Energy, Major Electrical Projects (MEP) The projects implementation of 40 circuit km 132kV cable lines (tot 7 circuit), 240 c 132kV cable joints, 42 x 132kV cable terminations, 40km of pilot cable installation, 80 pilot cable joints took place together with 6 supervisor, 5 Finnish jointing specialist and 250 electricians and technicians from local contractor.

ABB Installation in Sweden

Project Coordination

Carbon Power Plant Project in Stockholm Sweden.

- Planning, and co-ordination of supervision of all electrical installation works which were included in ABB Installations scope of contract.

- Co-ordination of installation works with ABB Carbon`s commissioning groups at the site. The project implementation of installation 600km of power and control cables, 18000 cable terminations, installation of cable trays, process electro/mechanical installation took place together 4 installation engineers, 8 supervisor, 160 electrician from Sweden, Denmark and Finland.

 

ABB CABLES in Iraq

Supervision / Project Coordination

132kV Cable project in Baghdad Iraq.

- All installation supervision work at HT 91/94 132kV Cable Project in Baghdad.

- Co-ordination of installation work with civil contractor from China.

- Testing and handing over to client (SOE). The projects implementation of 30 circuit km132kV cable lines, 105 x 132kV cable joints, 27 x 132kV GIS and 21 x 132kV ousted cable termination's, 30km of pilot cable installation 35 x pilot cable joints took place together with 4 supervisor and 160 electricians and technicians from China and 2 jointing specialist from Sweden.

SwePro Engineering in Sweden

Group Chief

Oil platform building for SUN-OIL company

at Gotavergen in Gothenburg Sweden.

- Co-ordination electrical installation and testing works at the Gotaverken Arendal in Gothenburg Sweden.

- Follow up time schedules. The projects implementation of 530km of power and control cables, 22000 x cable termination’s took place together with 6 installation engineers and 350 electricians from Sweden, Finland, Denmark, Norway and England.

ASEA ATOM in Sweden

Deputy Manager of Electrical Installation Department.

1100MW Nuclear Power Plant Project Oskarshamn III

in Oskarshamn Sweden.

- All electrical installation and testing work ( end of the project) at the Nuclear Power Plant in Oskarshamn III in Sweden. - Demobilization of the project.

SAHKOLAHTEENMAKI OY in Sweden
Installation Management

1100MW Nuclear Power Plant Project

Oskarshamn III in Oskarshamn Sweden.

- Execution of all electrical installation works which were included in Sahkolahteenmaki`s scope of contract. - Employment of electrician and other installation personnel for the project. - Co-ordination of installation of power and control cables, special termination’s, special cable penetrations and all works inside of the reactor closure building at nuclear power plant in Oskarshamn Sweden. The projects implementation of 175km of power (110kV - 0.6kV) cables, 5000 cable termination’s, 7000 special cable penetrations, 5km of metallic conduits and 10000 special termination’s took place together with 5 installation engineers and 55 electricians from Finland.

Contact

Oy Ställverksprodukter Ab
 

PO.Box 64, 26101 Rauma, Finland

Tel +358 40 554 3297

Tel +358 44 055 7244

Fax +358 2 822 9026
 

Email pauli.pitkanen@stallverksprodukter.fi​

bottom of page